California Public Utilities Commission California Energy Data And Reporting System Sandbox: test data only. Nothing here is filed with the CPUC.

CEDARS

Help: eTRM sync history

Impact profiles

Draft measure packages and their permutations are pulled from eTRM every night. A package with bad data is left out and listed here with the reason, so the PA that leads it can fix it in eTRM. A failed sync is retried and raises an alarm if it keeps failing.

How to

User guide: Cost-effectiveness runs

A tour of the page

On the page, the (?) beside the heading opens this help, and Take a tour of this page shows these steps one at a time beside the part of the page each describes. Some steps are only for parts that some people see, or that only some pages of this kind have.

  1. The last sync

    When it ran and what it brought in.

  2. Packages left out

    Each package left out and why. Search them by package.

  3. Recent syncs

    The last 20 syncs, newest first.

  4. Sync now

    For CPUC system administrators.

  5. Help on every page

    The question mark beside a page's heading opens this page's guide and its tour. All of Help, with the user guides and how to get support, is in the header.