California Public Utilities Commission California Energy Data And Reporting System Sandbox: test data only. Nothing here is filed with the CPUC.

CEDARS

Help: A release note

Release notes and limits

One announced change: what changes and why, the day it takes effect, the platform release it ships in (or that it needs no new code), and each change by kind (a specification, a rule, a limit or how CEDARS works) with what you need to do.

A limit change gives the limit's new value; the Limits page shows it as coming until it takes effect.

How to

User guide: Getting started

A tour of the page

On the page, the (?) beside the heading opens this help, and Take a tour of this page shows these steps one at a time beside the part of the page each describes. Some steps are only for parts that some people see, or that only some pages of this kind have.

  1. When and in which release

    Its status, the day it takes effect, when it was published, the release and, if published at short notice, why.

  2. The changes

    Each change, the part of CEDARS it touches and what you need to do.

  3. Guides revised for it

    The user guides rewritten for this release.

  4. Withdraw

    For CPUC system administrators. A published note is withdrawn, never edited.

  5. Help on every page

    The question mark beside a page's heading opens this page's guide and its tour. All of Help, with the user guides and how to get support, is in the header.